XRN 4992
Modification 0687 - Creation of new charge to recover Last Resort Supply Payments
Last Updated
|
04 May 2022 |
Status
|
Current
|
Release Type
|
Unallocated |
Implementation Date
|
01
Apr
2022
|
Proposer | Total Gas and Power | Impacted DSC service area |
Service Area 1 (Previous Dec 18 – Mar 21) Manage Supply Point Registration |
Customer Change Team Leader | uklink@xoserve.com |
Summary
This change seeks to create a new charge [SoLR customer charge], through which the Gas Distribution Networks (DNOs) will recover any LRSP arising from a SoLR event.
It is proposed that the SoLR customer charge is introduced into the Gas Transportation charging statements. This new charge will be split by domestic and non-domestic Charging Codes and will be calculated by each DNO.
The charge, which will be on a Supply Meter Point basis and will be calculated to recover the costs originating from each market sector, with mixed portfolios allocated by market sector code as held within UK Link (domestic or I&C).
XRN4992a - Interim Solution - This Change was scoped into November 2021 Major Release and the solution is due to be implemented April 2022.
Impacted Customer Types
- Shipper
- DNO
Documents
Document title | Comment | Last updated | CHMC outcome |
---|---|---|---|
Change Proposal | Change Proposal Raised | 01/08/2019 | Approved at ChMC on 07/08/2019 |
Initial Review | Stage not used | N/A | N/A |
DSG Discussions | N/A | 04/05/2022 | N/A |
High Level Solution Options (4992a) | HLSO for 4992a | 12/01/2022 | Option 4 approved |
Solution Review | Re-issue | 28/02/2022 | Solution approved ChMC on 12/01/2022 |
Detailed Design | N/A | N/A | N/A |
Evaluation Quotation Reports (EQR) | N/A | N/A | N/A |
Business Evaluation Reports (BER) | N/A | N/A | N/A |
Change Completion Reports (CCR) | N/A | N/A | N/A |
Timeline
Contact the Change Team
Need to get in touch with a member of the Change Team?
You can email us at: uklink@xoserve.com and we'll get back on the same day between the hours of 9:00am to 4:30pm.