Image of back arrow Back to filtered results

Modification 0687 - Creation of new charge to recover Last Resort Supply Payments

Last Updated
20
May
2020
Reference Number
XRN 4992
Proposer
Total Gas and Power
Customer Change Team Lead
uklink@xoserve.com
Release Type
Unallocated
Origination Date
01
Aug
2019
Implementation Date
TBC
Impacted DSC Service Area
Service Area 1
Manage Supply Point Registration
Status
Current

Summary

This change seeks to create a new charge [SoLR customer charge], through which the Gas Distribution Networks (DNOs) will recover any LRSP arising from a SoLR event.

It is proposed that the SoLR customer charge is introduced into the Gas Transportation charging statements. This new charge will be split by domestic and non-domestic Charging Codes and will be calculated by each DNO.

The charge, which will be on a Supply Meter Point basis and will be calculated to recover the costs originating from each market sector, with mixed portfolios allocated by market sector code as held within UK Link (domestic or I&C).

Impacted Customer Types

  • Shipper
  • DNO

Documents

Document title Last updated Type
XRN4992 20/May/2020 PDF

Timeline

Initial Review
Capture
Solution Consultation
Awaiting Delivery
In Delivery
Implemented

Contact the Change Team

Need to get in touch with a member of the Change Team?

You can email us at: uklink@xoserve.com and we'll get back on the same day between the hours of 9:00am to 4:30pm.