XRN 6081.C
NDM Check to Check Reconciliation – Enduring Solution
|
Last Updated
|
30 Apr 2026 |
Status
|
Current
|
|
Release Type
|
Major |
Implementation Date
|
TBC
|
| Proposer | Xoserve | Impacted DSC service area |
Service Area 4 (Current Apr 21) Meter Read/Asset processing |
| Customer Change Team Leader | uklink@xoserve.com |
Summary
The coverage of this change proposal is around the reconciliation process and invoicing of this to Shipper Users.
For Class 3 and 4 sites with Automated Meter Reading (AMR) equipment, Check to Check (C2C) reconciliation is performed when a site visit or RGMA actual read is received. This reconciliation must be based on the prevailing consumption which can be:
• The deemed allocated position – The position calculated for the Commodity invoice with no subsequent reads, or
• Actual consumption – Where readings exist, or
• A combination of both - If readings exist but do not account for the full. C2C period
Currently, the deemed allocated volume/energy, is always used as the prevailing position with existing readings not considered.
The objective of this Change Proposal is to ensure that, during a C2C reconciliation the tru prevailing volume position is used.
Impacted Customer Types
- Shipper
- DNO
Documents
| Document title | Comment | Last updated | CHMC outcome |
|---|---|---|---|
| Change Proposal | Change Proposal Raised | 30/04/26 | N/A |
| Initial Review | Stage not yet reached | N/A | |
| High Level Solution Options | Stage not yet reached | N/A | |
| Solution Review | Stage not yet reached | N/A | |
| Detailed Design | Stage not yet reached | N/A | |
| Evaluation Quotation Reports (EQR) | Stage not yet reached | N/A | |
| Business Evaluation Reports (BER) | Stage not yet reached | N/A | |
| Change Completion Reports (CCR) | Stage not yet reached | N/A |
Timeline
Contact the Change Team
Need to get in touch with a member of the Change Team?
You can email us at: uklink@xoserve.com and we'll get back on the same day between the hours of 9:00am to 4:30pm.